Sp_chart_OrderProcess (procedure)
工单进度
- Type: PROCEDURE
- Deterministic: NO
- SQL data access: CONTAINS SQL
Parameters
| # | Mode | Name | Type |
|---|---|---|---|
| 1 | IN | sLoginId |
varchar(100) |
| 2 | IN | sBrId |
varchar(100) |
| 3 | IN | sSuId |
varchar(100) |
| 4 | IN | bFilter |
varchar(5000) |
| 5 | OUT | sCode |
int |
| 6 | OUT | sReturn |
longtext |
Body
Body is not pre-cached. To inspect: mysql --defaults-file=~/.my.cnf -e 'SHOW CREATE PROCEDURESpchart_OrderProcess'._
Narrative
Business context: 生产图表分析 → 图表分析 → 决策支持 — the dashboard card 工单生产进度 renders a per-part/per-process Gantt-style heatmap (sCharType ColorBlock) showing scheduled hours for the work-order's processes across the active production plan window.
What it does: Walks mftproductionplanslave for in-progress states (1,2) to compute the time span, then joins mftworkordercontrol → mftworkordermaster → mftworkorderprocess to gather parts and processes, builds temp tables TMP_Part, TMP_PartDate, and loops to emit a JSON payload of data/day/sParts for the chart-renderer's color-block grid.
Invocation: Bound via gdsconfigcharmaster.sProcedureName on chart card 15982487350003335095626557923300 under 生产图表分析.
Hard-coded to work-order sBillNo = 'SGD20080065' — the routine ignores its bFilter input and always renders that one demo order. Either a partially-finished feature or developer-only sample; flag for maintainer audit if used in production.